Water District work, Sebago Lake, 1924

Contributed by Maine Historical Society/MaineToday Media

Water District work, Sebago Lake, 1924

Purchase a reproduction of this item on VintageMaineImages.com.

Description

This photo was taken during Portland Water District's construction of the new intake and conduit from Sebago Lake and appeared in the Portland Evening Express & Advertiser on December 9, 1924.

The men pictured, from left, are James J. Renchan, superintendent of the tunnel job; Harry U. Fuller, chief engineer of the Portland Water District; Charles B. Mitchell, resident engineer, and M. R. Kirkpatrick, core-drill expert.

The original gate and screen house, built in 1869 by the Portland Water Company, had been in use for 55 years but were not low enough to provide water to Portland in the event of another great fire. To remedy this, a new intake house was built with water entering 20 feet below the surface and then through five sets of double screens into the main pipe line, 45 feet below the surface.

The success of the construction of tunnels so far below the surface was dependent upon this team of experts.

View/Add Comments

About This Item

  • Title: Water District work, Sebago Lake, 1924
  • Creator: Portland Press Herald, Portland Evening Express & Advertiser
  • Creation Date: circa 1924
  • Subject Date: circa 1924
  • Town: Standish
  • County: Cumberland
  • State: ME
  • Media: Glass Negative
  • Dimensions: 7.6 cm x 10.8 cm
  • Local Code: Coll. 1949, 2005.061.9381
  • Collection: Portland Press Herald glass negative collection
  • Object Type: Image

For more information about this item, contact:

Maine Historical Society/MaineToday Media
489 Congress Street, Portland, ME 04101
(207) 774-1822
Website

Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please use this form.