Description
In 1908, the Portland Water District, after procuring the Portland Water Company, made its first priority improving water supply and pressure to Portland, Deering, South Portland, and Cape Elizabeth. After discussing the use of cast iron versus steel pipes, the District decided to construct the new transmission line from Sebago Lake to Portland using 42" cast iron pipes.
The United States Cast Iron Pipe and Foundry Company of Philadelphia Pennsylvania, won the contract for furnishing the cast iron pipe and specials, and John C. Tierney, of Hoboken New Jersey, was awarded the contract for hauling and laying the cast iron pipe and fittings. The Water District also hired engineer Allen Hazen, of New York, as a consultant for this project.
In this photograph workers are shown with lengths of pipe next to the excavator that was used to dig the trench for the pipeline. The transmission line was completed in 1912, after approximately one year of construction.
About This Item
- Title: Sebago Lake Water Transmission Line 1912, ca. 1912
- Creation Date: circa 1912
- Subject Date: circa 1912
- Location: Cumberland County, ME
- Media: Photographic print
- Dimensions: 12.5 cm x 17.70 cm
- Local Code: L1-6
- Collection: Large Photo Collection
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
Other Keywords
For more information about this item, contact:
Portland Water District225 Douglass St., Portland, ME 04104
(207) 523-5266
Website
The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.